Highway Division

Anthony Andrade, Superintendent
The Highway Division has a staff of thirty-two, composed of the Superintendent, Assistant Superintendents, Account Clerk, Lead workers, Heavy Equipment Operators, Truck Drivers, and Laborers. The Division is responsible for storm drains, road resurfacing, road repairs, street sweeping, catch basin cleaning, mosquito abatement program, maintaining former landfill site and operating compost site. The Division salts, sands and plows the 160 miles of City streets in the winter season. The Division participates in cleanups such as debris collected on City's water front and debris caused by various storms. The Division maintains the traffic signals, and installs signs such as stop signs, speed limit signs, and warning signs. The street pavement markings are also maintained by the Highway Division.
The Highway Division is located at 60 Commercial Way.
Contact Information: Anthony Andrade
401-435-7751
Aandrade@cityofeastprov.com
North Broadway Roadway and Bridge Improvements
North Broadway Roadway Improvements (RIDOT Project)
D’ambra Construction Company, Inc., will commence sidewalk improvements on the east side of N. Broadway, between Dewey Avenue and Tab Avenue. Improvements include the removal of cement concrete sidewalk, saw cutting, resetting of curbing, installing new curb transitions at driveways, water curb stop work and the installation of new cement concrete sidewalk and driveway aprons. Property owners will be notified by the Contractor prior to closure of driveway aprons. It is anticipated that driveways will be closed for up to three days.
Any questions please call RIDOT Field office: 434-5090
Street Sweeping
Street Sweeping Schedule 2012
Please call the Highway Division at 401-435-7751 to report any of the following:
Potholes or street repairs
Snowplow lawn damage (or other)
Signs or Signals, call to report malfunctioning or damaged traffic signals or damaged street and traffic signs.